Eastman School of Music
A 50,000-square-foot downtown architectural wonder that required 4,000 pieces of steel to be fabricated and delivered on a tightly-managed schedule.
Location
Rochester, NY
Project Summary
The challenge in fabricating and erecting 380 tons of structural steel for this 50,000-square-foot downtown architectural wonder was that there was no room for staging. Therefore, 4,000 pieces of steel were fabricated and delivered on a tightly-managed schedule with no room for error.
Bottom line: a challenging project involving a nearly 100-foot curved wall was completed on time and on budget despite the tight space.
Project Map
Related Projects

Pembroke CHS
New High School Gymnasium for Pembroke Central School District

GST Boces – Painted Post & Hornell
Two separate single story additions to existing structures, requiring 62 tons of steel.

