Eastman School of Music
A 50,000-square-foot downtown architectural wonder that required 4,000 pieces of steel to be fabricated and delivered on a tightly-managed schedule.
Location
Rochester, NY
Project Summary
The challenge in fabricating and erecting 380 tons of structural steel for this 50,000-square-foot downtown architectural wonder was that there was no room for staging. Therefore, 4,000 pieces of steel were fabricated and delivered on a tightly-managed schedule with no room for error.
Bottom line: a challenging project involving a nearly 100-foot curved wall was completed on time and on budget despite the tight space.
Project Map
Related Projects
![East Rochester School](https://www.ramarsteel.com/wp-content/uploads/2023/06/east_roch_school_1-750x500.jpg)
East Rochester School
![RIT Bus Shelter](https://www.ramarsteel.com/wp-content/uploads/2023/06/rit_bus_shelter_1-750x500.jpg)
RIT Bus Shelter
![RIT’s Institute Hall](https://www.ramarsteel.com/wp-content/uploads/2023/06/golisano_rit_3-750x500.jpg)
RIT’s Institute Hall
Fabrication and erection of 725 tons of steel for the 87,000-square-foot structure, including an 80-foot-high logo.